New Center
GRAND CABLE
NEWS
12
2017
Malawi MV Distribution Line Hardware and Accessories Procurement - Cable and Conductor Supply
Project Information:Owner: Electricity Supply Corporation of Malawi Limited (ESCOM)Delivery Date: 2017.12What We Supplied:16mm2 PVC Twin50mm2 AAC Ant Bare50mm2 AAC PVC Covered Ant100mm2 AAC Wasp50mm2 AAAC PVC Covered Hazel100mm2 AAAC PVC Covered Oak100mm2 AAAC Oak BareAerial Bundled Conductor, 70mm2
02
2018
Sudan 220kV Babanusa-Adila Power Transmission Project - Power and Earthing Cable Supply
Project Information:Owner: Sudanese Electricity Transmission Company (SETCO)Financier: Islamic Development Bank (ISDB)Operation Date: 2018.02What We Supplied:Copper Wire Strands 120mm2Copper Wire Strands 50mm2CU/XLPE/PVC-0.6/1KV 120mm2Project News:Sudan to extend electricity grid to DarfurThe Sudane
05
2018
Project Information:Owner: RURAL ELECTRIFICATION AGENCY (REA)Project Name: Opuyo-Moroto Transmission Line and associated Low Voltage ReticulationsConstruction of Distribution and Low Voltage networks in Karamoja Region under the Opuyo-Moroto 132 kV Electricity Transmission Line ProjectFinancier: Isl
05
2019
Angola 400kV Power Transmission and Transformation Project - Bare Conductor and Earth Wire Supply
Project Information:Owner: Ministry of Energy and Water (MIENA)Commercial Operation Date: 2019.05.13What We Supplied:AAAC Sorbus ConductorAlumoweld 19 No. 8 AWGProject News:Lauca – Waco Kungo Line, AngolaLauca – Waco Kungo Line is a 400kV overhead line with a length of 205km from Lauca Hydropower Pl
10
2019
Botswana Ramotswa 2 x 132/33kV 40MVA and 2 x 132/11kV 30MVA Substation Project - Power Cable Supply
Project Information:Owner: Botswana Power Corporation (BPC)Delivery Date: 2019.09.30What We Supplied:11kV MV POWER CABLES - SINGLE CORE11kV MV POWER CABLES - SINGLE COREEarthing CableProject News:Tender No. 9124/13-4: Provision of Detailed Engineering Design, Procurement, Construction and Commission
10
2019
Kenya OLKARIA V Geothermal Power Development Project - Earthing Cable and Conductor Supply
Project Information:Owner: Kenya Electricity Generating Company. (KenGen)Delivery Date: 2018.10What We Supplied:Annealed Copper WiresPVC Insulated Earthing CableProject News:LocationOlkaria Geothermal Project is situated within Hell’s Gate National Park 120KM from Nairobi and neighbours horticultura
08
2020
Egypt Assuit East/Gamasa 220/66/11KV GIS Substation Project - Control and Instrumentation Cable
Project Information:Owner: Egyptian Electricity Transmission Company (EETC)What We Supplied:Hard Drawn Bare Copper Conductor(HDBC) for Overhead TransmissionEarthing Bare Copper ConductorLV Power Cable Control CableInstrumentataion CableProject News:The Egyptian Electricity Transmission Company (EETC
08
2020
Nigeria Dangote Petroleum Refinery and Polypropylene Plant in Lekki Free Trade Zone - Cable Supply
Project Information:Owner: Dangote Oil Refining Company LimitedWhat We Supplied:LV Power CableInstrumentation CableEarthing CableProject News:Synopsis"Dangote – Lagos Lekki Free Trade Zone Integrated Refinery Petrochemical and Fertilizer Complex – Nigeria - Project Profile" contains information on t
05
2021
Ethiopia Beles-1 Sugar Factory Project - Power, Signal and Earthing Cable Supply
Project Information:Owner: Ethiopian Sugar Corporation.Operation Date: 2021.05.29What We Supplied:Instrument Analog Signals CableEarthing CableFire Alarm System cableOutdoor Fire Alarm Signal cableIndoor Fire Alarm Signal cableOutdoor Fire alarm telephone cableIndoor Fire alarm telephone cableOutdoo
10
2021
Nigeria 132/33kV Substation Project - Secondary Circuit Control and LV Power Cables Supply
Project Information:Project Name: Construction of Complete new 3No. 60MVA 132/33kV substation at Kuje, including 4 X 132kV line baysConstruction of Complete new 2No. 60MVA 132/33kV substation at Wumba/Lokogoma to be equipped with 2 X 132kV line bays including laying of 2 X 5km underground 132kV XLPE