Nigeria 132/33kV Substation Project - Secondary Circuit Control and LV Power Cables Supply


Project Information:

Project Name: 

Construction of Complete new 3No. 60MVA 132/33kV substation at Kuje, including 4 X 132kV line bays

Construction of Complete new 2No. 60MVA 132/33kV substation at Wumba/Lokogoma to be equipped with 2 X 132kV line bays including laying of 2 X 5km underground 132kV XLPE Cable, from New Apo to Wumba/Lokogoma

Construction of Complete new 2No. 60MVA 132/33kV GIS substation at Gwarimpa, including laying of 4 X 1km 132kV underground XLPE Cable, and termination of same on the existing 132kV DC Katampe Suleja transmission Line

Owner: Transmission Company of Nigeria (TCN)

Financier: Agence Francaise de Developpement (AFD)

Delivery Date: 2021.10

 

What We Supplied:

FRC CU/XLPE/PVC/STA/PVC-0.6/1kV 2C4~4C50mm2

FRC CU/XLPE/PVC/SSTA/PVC-0.6/1kV 1C120~1C240mm2

FRC CU/PVC/CTS/PVC/STA/PVC-450/750V 4C2.5~19C2.5mm2

FRC CU/PVC/PVC-0.6/1kV 3C1.5mm2

 

Project News:

The federal government of Nigeria has obtained a loan from the Agence Francaise de Developpement (AFD) to expand the power infrastructure in the Federal Capital Territory (FCT) through the Transmission Company of Nigeria (TCN).

 

TCN plans to apply a portion of the loan to eligible payments under the contracts and further intends to pre-qualify Engineering, Procurement and Construction (EPC) contractors for the following contracts under this project:

ICB No.: TCN/AFD/EPC-TL 001: Design, manufacture, supply, installation and commissioning of HV Transmission lines.

 

Lot 1: – Construction of about 143km of new 330kV double circuit line from Lafia 330kV Substation (new) to the proposed New Apo (Pigba) 330/132/33kV Substation.

 

Lot 2:- Construction of about 81 km of new 132kV double circuit lines, including:

Construction of about 11km of new 132kV double circuit line from new Apo (Pigba) 330/132/33kV substation to Old Apo 132/33kV substation.

 

Construction of 42km of new 132kV double circuit line from New Apo 330/132/33kV substation to the proposed Kuje 132/33kV substation.

 

Construction of 29km of new 132kV double circuit line from the proposed Kuje 132/33kV Substation to West Main (Lugbe) 330/132/33V substation.

 

ICB No.: TCN/AFD/EPC-SS 001: Design, manufacture, supply, installation and commissioning of 330/132/33kV substations.

 

Lot 3: Construction of 2No. 150MVA, 330/132/33kV substation at New Apo (Pigba) equipped with 2X330kV line bays, 3No. 60MVA 132/33kV transformers including 6 X 132kV line bays with 3 X 132kV line bays extension at Old Apo 132kV Substation and 2x 330kV line bays extension at Lafia.

 

Lot 4: Construction of complete new 2No. 150MVA, 330/132/33kV AIS substation at West Main (Lugbe) to be equipped with 2 x 330kV line bays, and 3No. 60MVA, 132/33kV Transformers with 132kV outdoor GIS Switchgear including 4X132kV line bays and 33kV indoor metal clad switchgears.

 

Lot 5: (a) Construction of complete new 3No. 60MVA, 132/33kV substation at Kuje including 4 x 132kV line bays.

(b) Construction of complete new 2No. 60MVA, 132/33kV Substation at Wumba / Lokogoma, to be equipped with 2 X 132kV line bays including laying of 2 x 5km underground 132kV XLPE Cable, from New Apo to Wumba/Lokogoma.

 

Lot 6: Construction of complete new 2No x 60MVA, 132/33kV GIS substation at Gwarimpa including laying of 4x1km 132kV underground XPLE cable and termination of same on the existing 132KV DC Katampe – Suleja Transmission line.